Pump locator

CHOOSE A LOCATION

EXPLORE and LEARN moreabout the facts and placements of pumps in different locationsand environments

Hotel

Industry: Hotel

Application: Water supply

Size: 23,000 m2, 221 rooms and an annual water usage at 28,105.00 m3

Reduced energy consumption: 74,692 kWh per year

Energy saving in %: 81.7 (over a 15 years period)

Investment: € 22,340

Payback time: 2.2 years

Saved money: € 76,411 (over a 15 years period)

Please note that any case featured above is to be seen as a best practice example, based on particular conditions for a specific installation environment. Therefore, it does not reflect the general savings potential of all applications or building types of this kind.